Sammet® Dampers

Sammet® Dampers are already used in over 120 countries and on countless ships on the world’s oceans.
Over the past 30 years, we have delivered nearly ten thousand dampers to thousands of different projects.
Engie Strasbourg
25 MW bioenergy Hybrid plant

CLIENT: Engie Solutions
PLANT: 25 MW bioenergy Hybrid plant
FUEL: wood chips,
CALIGO PRODUCT: Double scrubber condenser- units,
DELIVERY YEAR: 2025-2026
HEAT RECOVERY: + 6000 kW
SO2 DISPOSAL: Above 97 %
SOLIDS IN COND.: Below 10 mg/l
CONDENSATE: pH 6-9
Viitasaari
Viitasaari DH plant

CLIENT: Nevel Oy
PLANT: Viitasaari DH plant
FUEL: Peat and wood chips
CALIGO PRODUCT: Caligo Sandfilter with existing
process improvements
DELIVERY YEAR: 2024
ELECTRICITY CONS.: Below 2 kW
SOLIDS IN COND.: Below 10 mg/l
CONDENSATE: pH 6-9
Seskarö sawmill
9 MW bioboiler at a sawmill

CLIENT: Stenvalls Trä AB, Sweden
PLANT: 9 MW bioboiler at a sawmill
FUEL: Wood chips and bark
CALIGO PRODUCT: CS155D22BWTS216
Basic scrubber for belt dryer application
DELIVERY YEAR: 2024
HEAT RECOVERY: 30-35 %
ELECTRICITY CONS.: 18 kW
SO2 DISPOSAL: Above 97 %
IN/OUT PARTICLES: 20/20 mg/nm3
SOLIDS IN COND.: Below 10 mg/l
CONDENSATE: pH 6-7
Vatajankosken Sähkö Oy
Kankaanpää industrial plant

Fuel: Waste steam
Caligo product: CS055D33SHP2716WTS16 Basic scrubber
Delivery year: 2021
Heat recovery: 6,0 MW
Electricity cons.: 600 kW
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Flo Energie – Piveteau Bois
Sainte-Florence 15 MW bioboiler at a saw mill

Fuel: Wood chip and bark
Caligo product: CS155D28BWTS216 basic scrubber for belt dryer application
Delivery year: 2019
Heat recovery: 20-25 % (planned)
Electricity cons.: 28 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 150/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Herrfors Oy
Ylivieska 31 MW bioboiler (CHP)

Fuel: Hake, turve ja kuori
Caligo product: CS055D38PHP112WTS216 Lämpöpumppupesuri
Delivery year: 2019
Heat recovery: >30 % (planned)
Electricity cons.: 260 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 50/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Keitele Timber Oy
Alajärvi 14 MW bioboiler at a saw mill

Fuel: Wood chip and bark
Caligo product: CS155D26BWTS216 (basic scrubber for belt dryer application)
Delivery year: June 2019
Heat recovery: 35-40 % (planned)
Electricity cons.: 28 kW
SO2 disposal: Above 97 %
IN/OUT particles: 30/20 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Materials:
Scrubber mechanics: Super Duplex (EN 1.4410)
Condensate treatment: Acid proofed steel (EN1.4404)
Internal ducting: Acid proofed steel (EN1.4404)
Tower packings: Acid proofed steel (EN1.4404)
Keitele Energy Oy
Keitele 18 MW bioboiler at a saw mill

Fuel: Wood chip and bark
Caligo product: CS155D28BWTS216 (basic scrubber for belt dryer application)
Delivery year: July 2019
Heat recovery: 35-40 % (planned)
Electricity cons.: 35 kW
SO2 disposal: Above 97 %
IN/OUT particles: 30/20 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Materials:
Scrubber mechanics: Super Duplex (EN 1.4410)
Condensate treatment: Acid proofed steel (EN1.4404)
Internal ducting: Acid proofed steel (EN1.4404)
Tower packings: Acid proofed steel (EN1.4404)
Vaasan Kuljetuskanavat Oy
Tikkakoski 5 MW bioenergy plant

Fuel: Wood chip
Caligo product: CS033D18BWTS16 Basic scrubber
Delivery year: 2019
Heat recovery: >15 %
Electricity cons.: 20 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 30/30 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Lempäälän Energia Oy
7,5 MW wood chip heat plant

Fuel: Hake
Caligo product: CS033D24WTS16 Peruspesuri, jossa varaus lämpöpumppukytkennälle
Delivery year: 2018
Heat recovery: 20 % (planned)
Electricity cons.: 17 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 150/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Dalkia Tours France
9,5 MW bioboiler

Fuel: Wood chips
Delivery year: 2018
Caligo product: CS055D22SHP2716WTS16
Scrubber with two heat pumps
Heat recovery: 20-25 %
Electricity cons.: Below 515 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 50/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Pudasjärven Lämpö Oy
Pudasjärvi 8 MW bioboiler

Fuel: Wood chips
Caligo product: CS155D22BWT20 Basic scrubber
Delivery year: 2018
Heat recovery: 20 % (planned)
Electricity cons.: 28 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 300/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Haapajärven lämpö Oy
Haapajärvi 15 MW bioboiler

Fuel: Wood chips
Caligo product: CS055D28BWTS16 Basic scrubber
Delivery year: 2017
Heat recovery: 20 %
Electricity cons.: 26 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 50/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Nivalan kaukolämpö Oy
Nivala 25 MW wood chip heat plant

Fuel: Hake
Caligo product: CS055DS32BWTS16-CC Peruspesuri, jossa varaus lämpöpumppukytkennälle
Delivery year: 2017
Heat recovery: 20 %
Electricity cons.: 45 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 50/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Pöytyän Lämpökeskus Oy
Riihikoski 2,5 MW bioboiler

Fuel: Wood chips
Caligo product: CSS155D12BWT16 Piccolo basic scrubber
Delivery year: 2017
Heat recovery: 15 %
Electricity cons.: 11 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 150/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Paimion Lämpökeskus Oy
Paimion 9 MW wood chip heat plant

Fuel: Hake
Caligo product: CS055D22PHP106WTS16 crubber with heat pump
Delivery year: 2017
Heat recovery: 27 %
Electricity cons.: 180 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 50/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Vekaranjärven 5 MW plant

Fuel: Wood chips and peat
Caligo product: CS155D18BWT30 Basic scrubber
Delivery year: 2017
Heat recovery: 20 %
Electricity cons.: 20 kW
SO2 Disposal: Above 97 %
IN/OUT Hiukkaset: 150/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Alajärven Lämpö Oy
Alajärvi 9 MW bioplant

Fuel: Wood chips, peat and bark
Caligo product: CS255D22PHP106WT34 Scrubber with heat pump
Delivery year: 2016
Heat recovery: 35 %
Electricity cons.: Below 190 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 300/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Sotkamo 15 MW CHP plant

Fuel: Peat
Caligo product: CS155D26PHP108WT30 Scrubber with heat pump
Delivery year: 2015
Heat recovery: 25 %
Electricity cons.: Below 190 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 150/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Vilppula pellet factory

Fuel: Peat
Caligo product: TWT32
TWIN-condensate treatment and HMR heavy metal reduction
Delivery year: 2015
Electricity cons.: Below 10 kW
SO2 Disposal: Above 97 %
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Adven Oy
8MW wood chip heat plant

Fuel: Wood chips
Caligo product: CS155D20PHP104WT22 Scrubber with heat pump
Delivery year: 2014
Heat recovery: 30 %
Electricity cons.: Below 110 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 150/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Elenia Lämpö Oy
Toijala, 6 MW DH plant

Fuel: Wood chips and peat
Caligo product: CS155D18PHP104WT22 Scrubber with heat pump
Delivery year: 2014
Heat recovery: 28 %
Electricity cons.: Below 100 kW
SO2 Disposal: Above 97 %
IN/OUT Particles: 300/50 mg/nm3
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9
Tikkakoski 8 MW DH plant

Fuel: Peat and wood chips
Caligo product: WT22 Condensate treatment
Delivery year: 2014
Electricity cons.: Below 5 kW
Solids in cond.: Below 10 mg/l
Condensate pH: 6-9